2017~ Present
Center for Transportation Infrastructure Systems (ctis.utep.edu)
Ph.D. Research Assistant
-
Involving in Texas Department of Transportation (TxDOT-6949) project entitled establishing the best practice for design and construction of cement treated base materials (3-year project).
-
Developed innovative moisture susceptibility protocols for Texas Department of Transportation.
-
Preparing guidelines, proposals, final report & progress reports.
-
Performing statistical analysis and developing prediction models
-
Analyzing laboratory test results for selection, prediction and estimation of engineering design parameters.
-
Performing numerical modeling and simulation of pavement components.
-
Experience in field testing (FWD and GPR) and analysis.
-
Life Cycle Assessment (LCA) & Life Cycle Cost Analysis (LCCA) of Highway Construction Projects.
-
TA of Concrete & Geotechnical Engineering courses with 110 students.
-
Supervising 6 undergraduate students for the laboratory works.
2015~2017
Amoodrah Co. (www.amoodrah.com)
Geotechnical Engineer
-
Quality control & quality assurance services for Tunnels, Roads and Deep Foundations.
-
Designed new and innovative systems for water proofing of Under Ground Structure Using GCLs (Geosynthetic Clay Liners) and Geomembranes.
-
Designed geo-structures such as retaining walls, deep foundations, & tunnels.
-
Prepared and reviewed proposals, technical reports and specifications.
​
​
2012~2015
perlite Co. (www.perlite-co.com)
Project Engineer
-
Prepared more than 5,000 sheets of shop drawing & 3,000 sheets of as-built drawing in Iran Mall (1,000,000 sq. m area-concrete structure, 2.0b$)
-
Leadership and teamwork skills in a team made of 8 peoples including three structural engineers & five structural drafters
-
Designed geo-structures and structural elements.
-
Soil field explorations: Standard Penetration Test (SPT), Cone Penetration Test (CPT).
​
​
2009~2010
Navdisrah Co. (www.navdisrah.com/en)
Geotechnical Engineer
​
-
Actively contributing to a team project in Daryan rockfill dam with a height of 550 ft.
-
Installed Inclinometers & analyzed settlement.
-
Installed Piezometers & analyzed water pressure & Seepage.
-
Slope stability analysis of roadway embankments.